Abstract

A machine consists of two stochastically failing units. Failure of either of the units causes a failure of the machine and the failed unit has to be replaced immediately. Associated with the units are running costs which increase with the age of the unit because of increasing maintenance costs, decreasing output, etc. A preventive replacement policy is proposed under which, at failure points, we also replace the second unit if its age exceeds a predetermined control limit. It is proved that, for two identical units with exponential life-time distributions and linear running costs, this policy is optimal and the optimal control limit is calculated. In an additional model we take into consideration the length of time it takes to replace one unit or both units. The method of solution is a variation of dynamic semi-Markov programming. Analytical results are obtained and the influence of the various parameters on them is investigated. Finally, we study the saving due to our policy in comparison with a policy in which only failed units are replaced.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.