Abstract

This paper deals with the problem of obtaining the optimal scheduling of a pumped storage hydroelectric plant in combination with, several interconnected power systems. A special case of interest is the scheduling of pumped storage when the plant is jointly owned by several electric utilities. A mnathematical model is developed in order to determine the power flows between the different power systems and the pumped storage plant as well as the water flows inside the plant.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.