Abstract

The implementation of prefabricated buildings is hindered by the high construction cost. To address this problem, it is important to determine the efficient leverage of the supply capacity of local factories to assure just-in-time delivery to the construction site, as well as to accurately model the various types of cost to achieve a near-optimal procurement strategy. This paper describes a mathematical model to optimize the procurement of prefabricated components. A genetic algorithm is applied to efficiently obtain the minimum total cost that includes installation cost, business management cost and loan interest cost. Finally, a number of numerical experiments are conducted, showing that the procurement strategy generated from the proposed mathematical model is better than the traditional procurement strategy in terms of construction duration reductions and total cost savings. The component procurement method proposed in this paper improves the scientific management ability of decision-makers, and provides purchasing framework for other prefabricated structural forms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.