Abstract
In power distribution systems, with their great vastness and various outage causes, one of the most important problems of power distribution companies is to select a suitable maintenance strategy of system elements and method of financial planning for the maintenance of system elements with the two objectives of decrease in outage costs and improvement of system reliability. In this article, a practical method is introduced for the selection of a suitable system elements maintenance strategy; moreover, to plan the preventive maintenance budget for the system elements, two methods are offered: the cost optimization method and the fuzzy Analytic Hierarchy Process (AHP) method. In the former method, a new model of system maintenance cost is offered. This model, based on system outage information, the elements maintenance costs are determined as functions of system reliability indices and preventive maintenance budget. The latter method, too, a new guideline is introduced for considering the cost and reliability criteria in the trend of preventive maintenance budget planning. In this method, the preventive maintenance budget for the elements is determined based on relative priority of elements with reliability criteria. © 2015 Wiley Periodicals, Inc. Complexity 21: 70–88, 2016
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.