Abstract

Power in Adhoc network is a constraint resource. Due to the node standalone characteristic, such networks are limited in performance under high dynamicity. In the process of power utilization, it is required to control its usage to improve network lifetime. To achieve this objective a power scheduling scheme is outlined in this paper. The proposed power scheduling scheme controls the node operability by scheduling a node link period, by the incorporation of node, network and refreshment mechanism. The proposed scheduling scheme, save the power utilization, retaining the data integrity by collaboratively operating in the whole network.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call