Abstract

An optimal sizing method is developed in this work based on an analytical scheme for determining optimal operation decisions. Using the analytic optimal operation scheme allows for a more thorough optimal sizing method because of the minimal computational effort required as compared to mixed integer programming approaches. For example, an optimal sizing method based on this approach can more feasibly consider several years of weather data and the range of likely fuel/electricity costs for the term of operation of the PGU. The optimal sizing method in this work takes advantage of this efficient optimal operation scheme and provides a robust optimal solution with respect to weather and fuel/electricity cost uncertainty. A case study of a medium sized office building is carried out by testing the algorithm for a range of 20 commercially available diesel engine PGUs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.