Abstract

An optimal power flow (OPF)-based generation shedding for dynamic remedial action scheme (RAS) is proposed in this paper. A straightforward generation-shedding cost function is developed using pre-RAS and post-RAS OPF costs. The proposed method updates RAS control actions online based on the system operating conditions and cost functions. The proposed method is tested on a modified IEEE 39-Bus system. Test results demonstrate effectiveness of the proposed generation-shedding method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call