Abstract
A hybrid model for substation locating and sizing is presented in this paper to work out the number of newly-built substations and capacity-expansion, load assignment and optimal size of substation. Geographic information system is used as a platform to manage a great deal of data in this method, in which the optimum assembly model of the substation capacity and the number of substations be the first layer model, then the second layer model of load assignment is constructed by load constructing vector, and then improves traditional single location model as the third layer model of substation locating and sizing. Based on economy and reliability constraints, three- layer model is nested to each other, finally the improved quantum-behaved particle swarm optimization (IQPSO) algorithm is used as a new algorithm to solve hybrid model. The IQPSO algorithm is tested by a realistic planning project to verify the effectiveness and feasibility.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.