Abstract
This paper proposes an approach for determining the optimal location and size of an energy storage system (ESS) in a power system network integrated with uncertain wind power generation. The uncertainty of wind power output is represented by a scenario tree model, so that the nonanticipative behavior of operating decisions under system uncertainties can be properly addressed. The proposed formulation is too huge to be solved directly, so a Benders decomposition algorithm is applied to reduce the computational burden. Case studies are conducted to illustrate the influence of ESS on power system operation. It is shown that increasing the capital investment on ESS can reduce the daily operating cost of the power system. A capital/operating cost frontier is presented in this paper to demonstrate the tradeoff between ESS capital investment and daily operating cost, and to show how ESS planning decisions are affected by the budget for investment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.