Abstract

For commercial customers with a cogeneration system (CGS), a mixed integer programming model is used to examine effects of time-of-use (TOU) rate structure on the optimal operation of the system as well as its optimal capacity. Three case studies are performed for a hotel, a hospital, and an office building (20, 000m2 in total floor space, respectively). The optimal capacity of the generator under the flat rate is 50 to 70% of peak power demand. Effects of on-peak/off-peak energy charge ratio are saturated at a ratio of 5. It is not until the energy charge ratio of between 2 and 5 that the purchase of off-peak power increases in summer when price reduction is applied to city gas. As the energy charge ratio is raised, cheaper off-peak power is substituted for city gas and the summation of electricity energy charge and gas energy charge decreases. The simulation results indicate that properly designed TOU rates may provide commercial customers an incentive to operate a cogeneration system with an appropriate mix of the self-generation and commercial power.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.