Abstract

A multiperiod mixed-integer linear programming (MILP) model formulation is presented for the planning and scheduling of investment and operation in offshore oil field facilities. The formulation employs a general objective function that optimizes a selected economic indicator (e.g., net present value). For a given planning horizon, the decision variables in the model are the choice of reservoirs to develop, selection from among candidate well sites, the well drilling and platform installation schedule, capacities of well and production platforms, and the fluid production rates from wells for each time period. The formulation incorporates the nonlinear reservoir performance, surface pressure constraints, and drilling rig resource constraints. The resulting MILP model contains several thousand binary variables and is intractable using a full space branch and bound technique. A sequential decomposition strategy using aggregation of time periods and wells, followed by successive disaggregation, is proposed. Two examples are presented to illustrate the performance of the algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.