Abstract

With the expansion in scale and complexity of distribution networks, distributed state estimation (DSE), a real-time database for other on-line applications, is becoming popular for large-scale active distribution networks (ADN). Measurements from phasor measurement units (PMUs) with the same time stamp can assist DSE to obtain faster and more accurate estimation; however, the configuration of PMUs and communication links should be updated to support data collection and transmission. This paper proposes an optimal PMUs and communication links placement method for DSE in distribution networks. A network partitioning method is presented with the aim of balancing calculation times among subareas. Then, a binary integer linear programming model that simultaneously considers the optimal placement of PMUs, phasor data concentrators (PDCs) and communication links is proposed. The economy of the configuration scheme is guaranteed on the premise that the network is fully observable. Finally, case studies on the IEEE 33-node, PG&E 69-node and IEEE 123-node systems verify the feasibility of the proposed method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.