Abstract

This paper present different methods for optimal placement of phasor measuring unit (PMU) in power system for complete observability of the system. For smooth and efficient working of the system installation of phasor measuring unit become necessity. But due to high cost of PMU, it is not feasible to place it on every bus system. So, optimization becomes the crucial need. In present work for optimization power system toolbox (PSAT) is used. The proposed methods have been used and verified on IEEE-6, IEEE-9 bus system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call