Abstract

This paper proposes the optimal problem of location and power of the battery-energy-storage-system (BESS) on the distribution system (DS) considering different penetration levels of distributed generations (DGs). The objective is to minimize electricity cost of the DS in a typical day considering the power limit of DG fed to the DS. Growth optimizer (GO) is first applied to search the BESS’s location and power for each interval of the day. The considered problem and GO method are evaluated on the 18-node DS with two penetrations levels of photovoltaic system and wind turbine. The results demonstrate that the optimal BESS placement significantly reduces electricity cost. Furthermore, the optimal BESS location and power also help to reduce the cut capacity of DGs as their power greater than the load demand. The compared results between GO and particle swarm optimization (PSO) method have shown that GO reaches the better performance than PSO in term the optimal solution and the statistical results. Thus, GO is an effective approach for the BESS placement problem.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call