Abstract

This investigation considers a generalized inspection policy for a deteriorating production system with general random minimal repair costs. The inspection times for the inspection strategy are assumed to be non-negligible. Additionally, uncertainty probabilities associated with inspections are introduced. Using a dynamic programming formulation, the optimal inspection time for maximizing profit per unit time for a given overhaul/replacement time is determined. Next, the procedure is extended to determine the optimal periodic overhaul/replacement time, as well as the optimal number of inspections and their schedule.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.