Abstract

In order to better realize the development of construction production enterprises and create greater profit space for them, based on the relevant data of raw material suppliers and forwarders of a production enterprise within five years, this paper first uses ARIMA algorithm to solve the enterprise's ordering scheme, and then uses 0-1 integer programming to find the constraints between suppliers and forwarders, Finally, LINGO software is used to build the target programming model to solve the 24-week transfer scheme.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.