Abstract

In this paper a realistic model of seasonal production planning in the Swedish State Power Board (SSPB) System is described. This model properly accounts for the nonlinearities introduced by variable head losses and state dependent control constraints in the hydro system. The seasonal hydro-thermal problem exhibits certain complex features that prevent the use of existing nonlinear programming theory for its solution. The paper presents the development of a method of solution which recast the problem into a network flow formulation and employs network flow algorithms. This paper presents the latest developments in the area of network flow modelling for operations planning at the SSPB. For implementation of this scheme, to facilitate its use by operational engineers an information system is set up which will enable efficient handling of data bases and computational routines.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.