Abstract

This paper solves the optimal power flow (OPF) problem for a power system with a battery energy storage system (BESS). The optimization problem is also extended to minimize the size of the BESS. Additional constraints must be included to ensure the battery's net energy over a duration is zero. It was found that the cost of a BESS solely based on load leveling cannot be justified. A BESS should also be employed in systems with (i) higher load variations, and (ii) different types of generators. Optimal sizing was performed based on the idea that only a portion of the BESS cost should associated with the benefits of load leveling.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.