Abstract

Tailan river basin is a typical drought river basin in northwest China where construction of underground reservoirs is approved as an effective way to solve the problem of water resource shortage in the river basin. In order to ensure water supply efficiency of the underground reservoirs of the basin, it is necessary to research their recharge and supply patterns and to optimally operate them. This paper has, therefore, investigated different recharge locations and recharge ways through numerical simulation of underground flow in an underground reservoir area of the basin to explore a typical scheduling plan for optimal operation of the reservoir. The results show that it is better to recharge the reservoir using the flood season recharge approach at the centre of the reservoir area to ensure its continuous operation. Following from this recharge process, the use of a three-well pumping scheme is regarded as the best choice for optimal water supply from the reservoir. Also, the study indicates that for the same recharge amount, if the recharge time is closer to the pumping peak, then there is the more obvious effect of underground level recovery; the recovery is much better if the recharge time is more concentrated.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.