Abstract
The complex energy coupling and uncertainties of renewable energy and load make the dynamic scheduling of the integrated energy system (IES) very difficult. Therefore, an optimal operation method based on the multi-agent deep deterministic policy gradient algorithm (MADDPG) is proposed. Firstly, the IES model is established, and the optimal scheduling problem is transformed into the Markov decision problem; Then, the action-space, state-space and reward function of agents are designed which control energy conversion equipment and energy storage equipment respectively. Furtherly, a multi-agent framework is established based on the MADDPG; Finally, a scheduling simulation example was carried out. The simulation results indicate that compared with the single agent, the multi-agent framework can improve the stability of training for agents and the ability to explore the optimal solution.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.