Abstract

A systematic strategy for optimal plant operation during partial shutdowns is proposed. We consider the situation where one or more process units are shut down due to failure or maintenance but where the remaining units are able to continue operation to some degree. The goal of the strategy is to manipulate the plant degrees‐of‐freedom—during and after the shutdown—such that production is restored in a cost‐optimal fashion while meeting safety and operational constraints. Optimal control trajectories are obtained through the solution of a dynamic optimization problem. A novel multitiered optimization approach allows the prioritization of multiple competing objectives and the specification of trade‐offs between them. Uncertainty in the downtime estimate, a crucial parameter in shutdown optimization, is addressed through reoptimization. We employ a transient predictive control algorithm for implementing the computed control policy under feedback. © 2013 American Institute of Chemical Engineers AIChE J, 59: 4151–4168, 2013

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.