Abstract

A monthly planning and operational model has been developed for the Adelaide headworks system in South Australia, Australia. The model uses linear goal programming to aid in the identification of optimum operating policies for the system. The planning and operational policies obtained are aimed at achieving maximum yield for a given level of reliability. In this particular system, where a significant fraction of the supply is pumped from a distant river, a further objective is to minimize pumping cost. The results obtained for the Adelaide system indicate that savings of between 5% and 10% of total pumping costs can be achieved through the application of the model developed. Potential also exists for further reductions in pumping costs through improved forecasting of up to 20% of total pumping costs. Examples are also given of the use of the model to assist with operational decision making. This model has subsequently been implemented and the predicted savings in operating costs are being achieved by the local water authority, the Engineering and Water Supply Department.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.