Abstract
The effect of introducing steam-injected gas turbines into cogeneration plants is investigated from economical and energy-saving aspects on the basis of a mathematical programming approach. An optimal planning method is first presented by which the operational strategy is assessed so as to minimize the hourly running cost. Then, a case study is carried out on a plant used for district heating and cooling. Through the study, it is ascertained that the proposed method is a useful tool for the operational planning of steam-injected gas turbine plants, and that these plants can be attractive from economical and energy-saving viewpoints as compared with both simple-cycle gas turbine plus waste heat boiler plants and conventional energy supply ones.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.