Abstract
With the undergoing adjustment of the national energy structure of China, developing cascaded hydropower plants in hydro-solar complementary systems becomes an important way to optimize the energy structure. This study focuses on the risk that solar energy disturbances induce large load transfers between hydropower units that can cause hydropower units to frequently cross their vibration zones. Vibration zone crossing can further cause wear of mechanical components of hydropower units. To this end, considering the requirement of avoiding vibration zone crossing, the concept of the vibration zone crossing risk coefficient is introduced and a cascaded hydropower plant optimal operation model considering the risk of vibration zone crossing is proposed. Moreover, this is two-layer algorithm. This layer of algorithms includes improved migration model and migration operator is proposed to solve this mean a cascaded hydropower plant optimal operation model considering the risk of vibration zone crossing. Numerical simulation results based on the data of an actual hydropower plant are used to validate the proposed model and (IBBO-DP) algorithm.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.