Abstract

Flexible Load (FL) of electricity, heat and gas can improve the operation economy, flexibility and reliability of PIES. Aiming at the uncertainty of FL in the actual operation of the park integrated energy system (PIES), an optimal operation model of PIES with uncertainty of FL is proposed. Firstly, the uncertainty models of shiftable electric load and transferable load response are established, respectively. And then an adjustable heat load response model considering the uncertainty of solar radiation intensity is established. On this basis, an optimal operation model of PIES considering the uncertainty of the FL with the goal of maximizing the total revenue is constructed and is solved by the enhanced-interval linear programming method. Simulation indicate that FL can improve the operating economy of PIES and renewable energy consumption.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call