Abstract

At this stage, on the power supply system (PSS) terminal and the customer end, there are many kinds of researches of the energy storage’s (ES) application. However, the scientific research on the multi-zone collaborative production scheduling of new energy (NE) and ES on the power network is still in the development link. Therefore, the key scientific research on the application of ES on the power network is in this article. Based on clock frequency simulation, the paper creates a long-time multi-zone production scheduling entity model in which NE and ES operate harmoniously in the power network and puts forward the best operation countermeasures for NE and ES in different regions. Based on the power network’s data information in a specific place in our country, the simulation tests the entity model and production scheduling countermeasures created in the article. The simulation results show that for the PSS with extensive operation of new ES, the introduction of ES can increase the processing speed of new one and reduce the system’s total carbon consumption level (TCCL).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.