Abstract
Pumping station transfers water from Yangtze River, and the head of is varied frequently within a wide range due to the tidal water. Taking Jiangdu parallel pumping stations in China as a case, under the premise of pumping certain volume of water per day, considering head varying and time-varying electrical price, mathematical models were established aiming at the minimum operation cost and solved with Simulated Annealing Particle Swarm Optimization. The number of running pump units and pump unit operation duties were determined in different time periods. The results indicate that operation cost of optimal operation schemes considering time-varying electrical price and adjusting blade angles is saved 13.72% than that of not considering.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.