Abstract
This paper proposes a novel optimization model to maximize the power system observability by placing phasor measurement units (PMUs) in a multistage manner. The problem is constrained by the financial budgets available at each installation stage. The budget may be spent on purchasing and installing new PMUs and relocating PMUs already installed in the power system. This problem is very difficult to solve when the problem size becomes big. Therefore, a newly developed meta-heuristic, called chemical reaction optimization (CRO), is used to solve this optimal multistage PMU placement problem (OMPP), and numerical studies are carried out on the IEEE 57-bus, 118-bus, and 300-bus systems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.