Abstract

A multistage expansion planning problem is discussed concerning a gas turbine cogeneration plant for district heating and cooling using an optimization approach. An optimal sizing method for single-stage planning proposed by the authors is extended to this case. Equipment capacities and utility maximum demands at each expansion stage are determined so as to minimize the levelized annual total cost subject to increasing energy demands. A numerical study on a simple-cycle gas turbine cogeneration plant to be installed in a district development project clarifies the relationship between optimal expansion planning and energy demand trend, and shows the effectiveness of the proposed method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.