Abstract

This paper discusses the problem of effective motion planning for industrial robots. The first part dealt with current method for off-line motion planning. In the second part the presented work is done by one of the simulation systems with automatic trajectory generation and off-line programming capability. A spot welding process is involved. The practical application of this step strongly depends on the method for robot path optimization with high accuracy, thus transform the path into a time and energy optimal robot program for the real world, which is discussed in the third step.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.