Abstract

This paper deals with the scheduling problem of flexible manufacturing systems (FMS). The new contribution of the present paper is applying a brute force method (BFM) and joinable schedule approach (JSA) to FMS scheduling problems for multi-machine, multi-job flow shop systems (FSS). the purpose is to realize the minimum of maximum production time (makespan) close to global minimum in order to obtain optimal lot streaming (LS) thus improving system utilization. Independent sequence setup time is considered. A comparison study is performed. Numerical example is given. New results are presented and a general mathematical model of optimal LS for FMS scheduling problems of FSS is developed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.