Abstract

power system, under heavily loaded conditions, is at high risks of probable line outage and consequent voltage instability problem. Real power loss and voltage deviation minimization are reliable indicators of voltage security of power networks. This paper proposes a Particle Swarm Optimization (PSO) based optimal location and sizing of Static Var Compensator (SVC) to improve voltage stability under the most critical line outage contingency in a power system network. Line outages are ranked based on increased reactive power generation and line losses. Particle swarm optimization technique optimizes the location and size of the SVC.The effectiveness of the proposed work is tested in IEEE-30 Bus test system. It has also been observed that the proposed algorithm can be applied to larger systems and do not suffer with computational difficulties.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.