Abstract

Due to the rising infiltration of renewable energy sources, it is indispensable to investigate its brunt on the optimal power generation scheduling. However, the highly intermittent nature of renewable energy sources and their higher rate of outages may harm the entire grid. This work recommends fast convergence evolutionary programming (EP) with a time-varying mutation scale (FCEP_TVMS) for solving fixed head hydrothermal scheduling incorporating pumped-storage-hydraulic unit with demand-side management considering the uncertainty and outage of renewable energy sources. Simulation outcomes of the test system have been matched up to those acquired by fast convergence EP, colonial competitive differential evolution and heterogeneous strategy particle swarm optimisation. It is seen from the comparison that the recommended FCEP_TVMS technique can give a better-quality solution.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.