Abstract
Bundled wind–thermal generation system (BWTGS) is an effective way to utilize remote large–scale wind power. The optimal generation maintenance schedule (GMS) for BWTGS is not only helpful to improve the system reliability level but also useful to enhance the system economic efficiency and extend the lifetime of components. This paper presents a model to optimize the GMS for BWTGS. The probabilistic production simulation technique is employed to calculate the system costs, and a sequential probabilistic method is utilized to capture the sequential and stochastic nature of wind power. A hybrid optimization algorithm (HOA) based on the simulated annealing (SA) and multipopulation parallel genetic algorithm (GA) is developed to solve the proposed model. Case studies demonstrate the effectiveness of this proposed model. Effects of the reliability deterioration of thermal generating units (TGUs) and the pattern of BWTGS transmission power are also investigated.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.