Abstract

The aim of the research is to improve the maintenance  system of a traction motor (TM) ED-118A by predicting the life of frame insulation and determining  recovery moments while ensuring the lowest unit costs for performing major repairs of volume 1 (MjR-1) and permanent repair of volume 3 (PR-3), taking into account the degree of recovery, using data on the insulation state by the return voltage method operation.  In  the research , the optimization of the unit costs for the overhaul of the MjR-1 and the  repair of the PR-3 to restore the insulation properties, with restrictions on the value of the return voltage and the insulation  mileage  to MjR‑2, taking into account the degree of restoration when performing the PR‑3 and MjR-1. A method is proposed for predicting the life of frame insulation and determining  moments of its recovery, taking into account the recovery factor when performing PR‑3 and performing MjR‑1 and data on observations of the return voltage. Researches were carried out in accordance with the “State Program for the Strategic Development of  Ukrainian Railways”, prepared by the State Research Center for Railway Transport of Ukraine in conjunction with Ukrzaliznytsya specialists and the Program for the renewal of railway rolling stock for the period up to 2020, where indicated by need for creation of modern systems maintenance and repair of traction rolling stock of a new generation and the development of appropriate regulatory documents.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call