Abstract

An advanced model is proposed for grid connectivity of an interconnected network consisting of a charging station for electric automobiles. To automate the discharge procedure of charging/ the battery energy storing system, a wind network, the photovoltaic system, and the battery energy storing system is developed to efficiently increase the consumption degree of solar and wind energy sources and create renewable inner-city capacity. On the basis of DC bus architecture, the power design was planned such that buffered storage systems and renewable energy resources can be incorporated. The proposed optimal control algorithm uses the Swarm Optimization Algorithm consists of Multi-Objective Particle, developed for electric vehicles charging or discharge behaviors to minimize the overall actual energy loss and increase the integration of EVs with power networks due to the efficiency and economy of network activity, taking into account the economic issue and the satisfaction of consumers, the voltage limits and the parking availability pattern. To test the proposed EV charging strategy, simulation studies based on efficiency, and assessed major energy fluxes within the device. Energy management approaches have also been developed to optimize the power requirements and charging times of various electric vehicles. Results suggest that proposed model will substantially reduce the power grid’s operational costs while meeting the charging criteria of the customer. Improved performance on global search capabilities is also checked, as is the desired outcome of enhanced particle swarm optimization algorithm. The findings show that the new approach is in a position to prepare EV charging times optimally, taking into account electronic knowledge and uncertainty.

Highlights

  • With a great amount of PHEVs integrated into the distribution grid, a growing number of on-board batteries need to be charged via the infrastructure, such as with dedicated charging stations in parking lots

  • Considering the regular and real-time markets based on heuristic algorithms, an optimisation problem with the scheduling of electric vehicles (EVs) charging with energy storage was studied [15]

  • The electric vehicle charging prototypes are checked for the time character of the connection based on the specific way the electric vehicles are linked to power grid

Read more

Summary

INTRODUCTION

With a great amount of PHEVs integrated into the distribution grid, a growing number of on-board batteries need to be charged via the infrastructure, such as with dedicated charging stations in parking lots. By storing the excess electrical energy generated by RESs, PEV battery packs can assist the main grid during low power demand cycles In this situation, the central grid delivers power flow to on-load vehicles that can compete with the utility market's frequency and voltage regulatory services. To assist the main grid with ancillary services mentioned to as vehicle-to - grid facilities, electrical energy kept in battery packs of PEVs may be used, which often act as well-organized peak power and spinning resources In this latter scenario, the use of bi-directional on-board or off-board battery chargers and PEVs communicate with the key grid as power users and as distributed generation systems, is appropriate for this reason. It is assumed that the GSO will continue to monitor the contract status, contact information, owner conditions and level of payments for each PEV

THE PROPOSED REAL-TIME ENERGY MANAGING PROCEDURE
THE EV CHARGING OPTIMIZATION CONTROL STRATEGY
SMART CHARGING SCHEME
D N min f2
THE PROPOSED MOPSO IMPLEMENTATION
Findings
VIII. CONCLUSION
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call