Abstract
The management of the economy and the mathematical formulation of the problem of optimal dynamic (multiperiod) logistic planning of the initial and modified supply chain of a gas condensate stabilization plant has been suggested in the form of a multidimensional mixed-integer linear programming problem. An interactive procedure for solving this problem has been developed using the Oracle Strategic Network Optimization software suite. Optimal logistic planning parameters have been calculated for the new modified supply chain with the commissioning of a new plant for processing a wide fraction of light hydrocarbons.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.