Abstract

In electrical power systems, distribution networks have considerable power losses compared with the other parts of electrical power systems. This caused by the distance of power plant to the load center. The high value of power losses causing disadvantage for the electricity provider company. This study aims to reduce power losses in the MLBC feeder distribution network by erecting the distributed generation. The optimal location for erecting distributed generation sought by using the Particle Swarm Optimization (PSO) method. Before distributed generation erected in MLBC feeder distribution network, the power losses’ value is 128.1 kW. Locating the most optimum location for erecting the distributed generation is using the particle swarm optimization method, bus 13 on the MLBC feeder distribution network was the optimum location for distributed generation erection. Hence, the loss value from load flow simulation is 67.5 kW or 60.6 kW for power loss reduction after distributed generation installed on bus 13.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.