Abstract

ABSTRACTThis paper develops the algorithm for the optimization designs of the adaptive T2 Control Chart for Monitoring the Mean Vector of a Multivariate Normal Process. It includes the variable sample size, variable sampling interval and variable dimensional chart. The VDT2 control chart performs well for moderate and large shifts in the mean vector. However, its performance for small shifts is poor. To improve the chart's performance in detecting such shifts, we propose the application of the variable sample size and sampling interval technique to the VDT2 control chart, resulting in the VSSIVDT2 control chart.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call