Abstract

The target of stand-alone hybrid power generation system was to supply the load demand with high reliability and economically as possible. To design these criteria the optimal design of the proposed configuration should be done by using intelligent optimization technique. This study utilized Genetic Algorithm method to determine the optimal capacities of hydrogen, wind turbines and micro hydro unit according to the minimum cost objective functions that relate to these two factors. In this study, the cost objective function included the annual capital cost, annual operation maintenance cost, annual replacement cost and annual customer damage cost. The proposed method had been tested in the hybrid power generation system located in Leuwijawa village in Central Java of Indonesia. Simulation results showed that the optimum configuration can be achieved using 19.85 ton of hydrogen tanks, 21 x 100 kW wind turbines and 610 kW of micro hydro unit respectively. DOI: http://dx.doi.org/10.11591/telkomnika.v10i6.1326 Full Text: PDF

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.