Abstract
The work presented in this paper is derived from an existing model for an imperfect process model (Moon et al., 2002) under constraint of setup time, and the total production time per cycle is equal to the cycle length. This paper considers the investment in setup cost reduction and quality improvement in: imperfect production process; imperfect production process with inspection and restoration. A solution algorithm using the Lagrangian approach with the objective of minimising the expected total cost is developed to simultaneously solve the cycle length, number of inspections, setup reduction and quality improvement for different products. Numerical examples are used to illustrate comparison of the performances with investment in setup cost reduction and quality improvement. [Received 11 August 2007; Revised 20 December 2007; Accepted 4 May 2008]
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.