Abstract
Modular reconfigurable machines offer the possibility to efficiently produce a family of different parts. This paper formalises a cost optimisation problem for flow lines equipped with reconfigurable machines which carry turrets, machining modules and single spindles. The proposed models take into account constraints related to: (i) design of machining modules, turrets, and machines, (ii) part locations, and (iii) precedence relations among operations. The goal is to minimise equipment cost while reaching a given output and satisfying all the constraints. A mixed integer programming model is developed for the considered optimisation problem. The approach is validated through an industrial case study and extensive numerical experiments.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.