Abstract
Ever increasing load demand has questioned power system planners and operators all over the globe for its reliable and efficient performance. Recently, integration of Distributed Generation (DG) in Distribution system finds higher penetration levels for catering most of the load demands. The impacts of DG units concern for voltage stability, frequency deviation and relay coordination and must be analysed effectively. This paper proposes a novel scheme on optimal relay coordination with reliability assessment under the presence of Wind Turbine Generators (WTGs). Optimal placement of WTG can be approximated by sensitivity indices (L-index). The coordination is carried out by graphical approach and by physical alteration of pick up value, Plug Setting Multiplier (PSM) and Time Dial Setting (TDS) and further reliability assessment is carried out. The proposed scheme is tested on ANSI Model system using ETAP. The results obtained are far more encouraging.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.