Abstract

When the distribution network is connected to distributed energy sources (DER) such as large-scale photovoltaics and wind power, the volatility and intermittency of distributed energy sources will adversely affect the power grid. In view of the adverse effects of distributed energy access to the regional distribution network on load characteristics, comprehensively considering the energy storage operation constraints, charge and discharge power constraints and power flow balance constraints of the distribution network, an optimal configuration model of the energy storage system is established, and the control strategy is optimized. Take “peak shaving and valley filling” and “smooth load” as load control objectives respectively. The optimization strategy is used to control the load variance and the square of the load change. Combined with the cost optimization of the energy storage system, the GUROBI algorithm is used to solve the model optimization, and the load characteristics and energy storage optimization trends under different energy storage charge and discharge power constraints are obtained. The changing trend of the optimal configuration of capacity provides an effective reference for the configuration of the energy storage system.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.