Abstract
For technologies with significant interconnection delays, optimal clock period selection before/during high-level synthesis is not practical. In our approach, we start with a synthesized RTL data path structure, perform place and route and back-annotate the interconnection delays. A set of potentially optimal clock periods are chosen by evaluating 'critical' paths to minimize the dead time associated with operations. Finally, the controller costs at these clock periods along with the execution times decide the optimal clock period. Extensive experimental results on data paths synthesized from high-level synthesis benchmarks establish both the utility as well as the efficiency of our approach.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.