Abstract
A procedure is proposed to determine where and when to increase the capacity of lines and transformers in a power subtransmission network. The expansion plan must minimize cost while supplying the demand for energy over a time horizon, keeping the quality and reliability standards of the network and minimizing the impact over the environment. The procedure is iterative and takes into account AC flows, reliability analysis, different scenarios, demand uncertainty, discrete investment costs, voltage constraints, capacity, and power factor. A significant contribution of this procedure is that, along with the expansion plan, it considers the optimization of the operation, specifically the movement of transformer taps and the location and sizing of reactive banks. This allows significantly reducing or delaying the investment, thus reducing its present value. The approach ensures convergence when computing the power flows and allows making an analysis of the effects of distributed generation and, if necessary, ...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.