Abstract
SUMMARY This paper presents a model for obtaining the optimal buffer space size in two-stage machining systems. It is shown that the optimal buffer space size is the one necessary to keep the critical machine running even when there are tool failures and subsequent tool changes on the non-critical machine. An analytical expression for the optimal buffer space size is derived when tool failures follow a Markovian process and the objective function is the minimization of the unit cost. A simulation mode! is developed for obtaining the optimal buffer space size when tool failures follow a non-Markovian process. It is shown that the optimal buffer space size depends on the expected delay time per part due to tool failures on the non-critical machine (which depends on the probability of tool failure on the non-critical machine during machining on the critical machine), on the labour and the buffer space cost, and on the tool-change time. The model can be extended to cover the case of two or more identical para...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.