Abstract
A new blast-furnace charging system ensures more uniform azimuthal distribution and optimally nonuniform radial distribution of the batch and gas. The coke consumption is reduced by 20–30 kg/t of hot metal, with 2% increase in output. The new design should recoup its cost within a year.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.