Abstract

This paper addresses lot sizing decisions when defective items can be reworked. In this work, models have been developed considering rework process for a single-stage and a multi-stage production system. In the first model, an optimal multi-order policy of raw materials to meet the demands of a production facility considering rework process, which supplies fixed quantity of finished products at fixed intervals of time, is developed to minimise the Total Cost (TC). In the second model, an optimal multi-order policy of raw materials to meet the demands of a multi-stage production facility linked with kanban mechanism considering rework process which supplies fixed quantity of finished products at fixed intervals of time is developed to minimise the TC. It is concluded that the TC with rework policy tends to be higher than that without considering rework.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.