Abstract
An economic design of inspection effort allocation is considered for a serial multistage production system in which a product consists of many identical components, only a limited number of automatic inspection machines are available, and the rate of production is constrained by the rate of inspection. A cost model is constructed and a method of finding optimal locations of inspection machines and inspection level—proportion of components inspected—is presented. For situations where the numbers of stages and inspection machines are large, a heuristic allocation algorithm using dynamic programming is proposed. A numerical example describing the solution procedure and a simulation study, evaluating performance of the proposed algorithm, are given.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.